测量作业指导书 联系客服

发布时间 : 星期一 文章测量作业指导书更新完毕开始阅读a09535fec8d376eeaeaa31a1

新建山西中南部铁路通道ZNTJ-6标项目经理部第六分部 测量作业指导书

目 录

1.编制依据 ······················································································································································ 2 2.执行标准 ······················································································································································ 2 3.工程概况 ······················································································································································ 2 4.测量人员及仪器保障 ······························································································································ 3 4.1测量人员 ······································································································································· 3 4.2测量仪器 ······································································································································· 4 5.CP1和CP11控制测量描述及精度 ······································································································ 4 5.1 CP1和CP11测量精度 ················································································································· 4 5.2基础平面控制网(CPⅠ)测量 ··································································································· 5 5.3线路控制网(CPⅡ)测量 ··········································································································· 6 6.加密点控制描述及精度分析 ·················································································································· 7 6.1平面加密点描述及精度分析 ······································································································· 7 6.2水准加密点描达及精度分析 ······································································································· 8 7.施工测量 ··················································································································································· 8 7.1施工测量方法和日常测量 ··········································································································· 8 7.2洞内导线点延伸的方法 ············································································································· 19 8.控制测量的计划安排和复核计划 ······································································································· 21 8.1控制测量的计划安排 ················································································································· 21 8.2控制测量的复核计划 ················································································································· 22 9.贯通误差预计分析 ································································································································ 25 10.贯通误差调整方案 ······························································································································ 26 10.1平面贯通误差的调整 ··············································································································· 26 10.2高程贯通误差调整 ··················································································································· 28 11.竣工测量 ··············································································································································· 28 11.1隧道净空断面测量 ··················································································································· 28 11.2高程测量 ··································································································································· 29 12.监控量测 ··············································································································································· 29 12.1监控量测工艺概述 ··················································································································· 29 12.2工作内容、方法和仪器 ··········································································································· 29 12.3量测频率与结束标准 ··············································································································· 32 12.4监测数据的统计分析与信息反馈 ··························································································· 33 12.5初期支护监测结果异常的处理 ······························································································· 35

1

新建山西中南部铁路通道ZNTJ-6标项目经理部第六分部 测量作业指导书

测量作业指导书

1.编制依据

⑴《新建铁路工程测量规范》(TB10101—2009); ⑵《全球定位系统(GPS)铁路测量规程》(TB10054); ⑶《全球定位系统(GPS)测量规程》(GB/T18314—2001); ⑷《国家一、二等水准测量规范》(GB12897—1991); ⑸《国家三、四等水准测量规范》(GB12898-1991); ⑹《铁路隧道监控量测技术规程》TB 10121一2007 ⑺《铁路隧道工程施工指南》(TZ204-2008)

2.执行标准

我分部管段设计为无砟轨道铁路,按客货共线列车设计行车速度120km/h,预留提速条件。该段铁路测量按以下标准执行:

⑴《国家一、二等水准测量规范》(GB12897—1991); ⑵《国家三、四等水准测量规范》(GB12898-1991); ⑶《新建铁路工程测量规范》(TB10101—2009);

3.工程概况

南吕梁山隧道位于山西省临汾市境内,隧道线路贯穿于南吕梁山山脉以东及临汾盆地边缘丘陵区。隧道进口端位于蒲县境内,出口端位于临汾市尧都区及洪洞县交界处,设计为双洞单线隧道,线间距30m。1#斜井长2450m,2#斜井2630m。正洞承担里程段为DK301+285~DK310+800,位于直线段上,隧道内设计为单面坡,自洞口起分别以

2

新建山西中南部铁路通道ZNTJ-6标项目经理部第六分部 测量作业指导书

8‰(坡长575m)、12.6‰下坡至隧道出口;右线均位于直线段上,隧道内设计为单面坡,自进口起分别以6.6‰ (坡长795m)、 12.6‰下坡至隧道出口。分别在DK304+200、DK309+050附近设置1#、2#斜井。采用双车道无轨运输断面,其中1#斜井长度分别为2450m,综合坡率为11.1%,2#斜井长度为2630m,综合坡率为11.4%,见图。

图 -1斜井布置图

4.测量人员及仪器保障 4.1测量人员

分部组织具有多年测量经验的测量工程师负责测量工作,一般测量工作由具有测量资质的技术人员完成;建立和完善测量工作规章制度和复核流程,测量技术人员对测量资料进行整理归档。分部配置主要测量人员如下:

测量主要人员表

编号 1 2 3 4 5 6 7 8 姓 名 余兴章 杨荣 赵宇峰 张思明 李震 聂克 郭廷廷 杨峰 职 称 工程师 工程师 助理工程师 助理工程师 助理工程师 助理工程师 助理工程师 助理工程师 职 务 测量负责人 测量负责人 测量员 测量员 测量员 测量员 测量员 测量员 测量工作年限 11 12 3 3 3 3 3 3 备 注 1#斜井 2#斜井 3

新建山西中南部铁路通道ZNTJ-6标项目经理部第六分部 测量作业指导书

9 廖勇 技术员 测量员 3 4.2测量仪器

分部根据测量要求,配置一定数量、精度高、技术性能稳定的仪器。仪器在进场前必须检定合格方可使用;在测量过程中如发现仪器出现异常情况,须经检定后可再次投入使用;测量仪器指定专人管理,定期进行检定校核。仪器配置仪器见下表:

测量仪器配置表

序号 1 2 4 类别 全站仪 经纬仪 水准仪 名称及厂家 徕 卡 北光 北光 规格型号 TCR402 经纬仪 DZS3-1 数量(套) 2 1 1 产地 瑞士 北光 北光 检定日期 2010年5月23日 2010年5月23日 2010年5月23日 有效日期 2011年5月22日 2011年5月22日 2011年5月22日 5.CP1和CP11控制测量描述及精度

无碴轨道铁路工程测量的平面、高程控制网,按施测阶段、施测目的及功能可分为勘测控制网、施工控制网、运营维护控制网。各阶段的平面控制测量应用共同使用一个GPS基础平面控制网。

无碴轨道铁路工程测量平面控制网按分级布网的原则分三级布设。第一级为基础平面控制网(CPⅠ),第二级为线路控制网(CPⅡ),第三级为基桩控制网(CPⅢ)。各级平面控制网的作用为:

① CPⅠ主要为勘测、施工、运营维护提供坐标基准; ② CPⅡ主要为勘测和施工提供控制基准;

③ CPⅢ主要为辅设无碴轨道和运营维护提供控制基准。

5.1 CP1和CP11测量精度

无碴轨道铁路工程测量平面控制布网按下表要求执行:

4