超完整工程造价毕业设计--综合办公楼工程招标控制价编制 联系客服

发布时间 : 星期二 文章超完整工程造价毕业设计--综合办公楼工程招标控制价编制更新完毕开始阅读a56bce7cf8c75fbfc67db20f

四川理工学院毕业设计

综合办公楼工程招标控制价编制

学 生: 学 号:

专 业:工程管理

班 级:工程管理2011.3

指导教师:

四川理工学院建筑工程学院

二O一五年六月

摘 要

招标控制价是根据国家或省级、行业建设主管部门颁发的有关计价依据和办法,按设计施工图纸计算的,对招标工程限定的最高工程造价。招标控制价包括分部分项工程费、措施项目费、其他项目费、规费、税金。

随着我国建筑市场的不断发展和日益繁荣,对建筑工程招投标市场的管理也趋于规范化和专业化。招标控制价作为工程招投标过程中一个重要组成部分,能有效控制项目投资,增加了招标过程的透明度。

本设计是以自贡市综合办公楼工程项目为编制对象,在充分研究和熟悉图纸的基础上,编制完成该项目土建部分的招标控制价编制。按照国家颁布的现行计价规范、四川省计价定额、相应的规程规定以及本工程的建筑与结构施工图纸、说明、选用的图集及说明,套用综合单价计价模板,编制出本工程的招标控制价,并列出招标控制价、工程量清单计价表以及综合单价分析表。最后,依据以上内容对本设计进行经济技术分析。

关键词:招标控制价;工程量清单;综合单价

ABSTRACT

Tender control price is according to the national or provincial level, industry issued by the competent department of construction of the valuation basis and method, calculated according to the design and construction drawings, project bidding limit the highest engineering cost. The bidding price control including project sub engineering fee, fee, fee, other measures project fees, taxes.

With the continuous development and prosperity of the construction market, the management of the construction engineering bidding market tends to be standardized and professional.. Tender control price as an important part of the bidding process, can effectively control the project investment, and increased the transparency of the tendering process.

This design is based on the comprehensive office building project of Zigong, and the preparation of the bid control price of the civil parts of the project is compiled based on the full research and the familiar drawings.. In accordance with the issued by the state of the current valuation standard, Sichuan Province valuation quota, the corresponding rules and the engineering construction and construction drawings, description, selection of atlas and instructions, apply comprehensive unit price valuation template, the preparation of the project bidding price control, standard control price, engineering quantity list valuation table moves parallel and comprehensive unit price analysis table. Finally, according to the contents of the design of economic and technical analysis.

Keywords: bid control price; bill of quantities; comprehensive unit price