2012年9月考试PMP认证模拟考试一试卷200题(含解析) 联系客服

发布时间 : 星期日 文章2012年9月考试PMP认证模拟考试一试卷200题(含解析)更新完毕开始阅读adc7e426dd36a32d7375817a

B) 必须立即通知公司管理层,确保问题及时被讨论。

C) 在问题升级到公司管理层之前,调查该问题的详细信息。 D) 迅速找出解决问题的办法,而且即刻履行。 188.In order to speed up a project,you made a decision to fast-track a phase currently performed with five team members and another one which was planned to begin in four weeks time with another five team members.Which of the following activities should you do first?

A) Make sure that all exit criteria of the consecutive phase have been met to ensure the flow of

communications in a team situation which is more complex by a factor of 2.

B) Make sure that all entry criteria of the previous phase have been met by planning and

performing a phase gate meeting to assess technical aptness. C) Make sure that all exit criteria of the previous phase have been met by planning and

performing a phase gate meeting to assess technlcal perlormance. D) Restructure your team and delegate tasks in ordcr to ensure the flow of communications in a

team situation which is more complex by a factor of 4.5

为了加速项目,你决定快速跟进某个阶段,这个阶段现在由5个团队成员执行;另一个将在第四周开始,由其他5个团队成员执行。你应该首先进行下列哪项活动?

A) 确认所有后续阶段的退出标准被满足,确保沟通顺畅,因为这种情况下沟通比以往复杂了2倍。

B) 通过计划和执行一个阶段会议来评估技术能力,以确认所有之前的阶段的进入标准被满足。

C) 通过计划和执行一个阶段会议来评估技术绩效,以确认所有之前的阶段退出标准已经被满足。

D) 重组你的团队并分配任务以确保沟通顺畅.因为这种情况下沟通比以往复杂了4.5倍。 189.Which of the following tools is used to create a risk managemcnt plan? A) Risk planning meetings. B) Documentation reviews. C) Data precision rankings. D) Diagramming techniques. 下列哪个工具被用于创建风险管理计划?

A) 风险规划会议。 B) 文档回顾。 C) 数据精确评级。 D) 图形技术。

190.A project manager spent some days to create a multi-page document which he called project charter.The document should have been issued by the project sponsor.The sponsor found the document outsized and asked for a condensed document.Which of the following is not normally an element of the project charter?

A) The formal authorization to apply organizational resources to proiect activllies. B) Detailed control account and work package descriptions. C) The business need that the project was undertaken to address. D) The product description or a reference to this document.

项目经理花了些时间来创建一个多页的文档,它被称为项目章程。该文档必须由项目出资人来发布。出资人认为这个文档太大了,要求进行缩减。下列哪项不是项目章程正常包括的元素?

A) 正式授权应用组织资源到项目活动中。 B) 详细的控制账户和工作包描述。

C) 项目的商业需求。 D) 产品描述或文档的参考。 191.A production process has been defined as part of an industrial equipment manufacturing

project.The process is intended to produce steel bolts with a length of 20 cm.The control limits are 19.955 cn]and 20.045 cm.The measurements made at the end of the process yielded the following results:20.033 cm,19.982 cm,19.995 cnl,20.006 crn,19.970 tin,19.968 cm,19.963 cm,19.958 cm,19.962 cm,19.979 cm,19.959 cm.What should be done? A) The process is under control.It should not be adjusted.

B) A special cause should be investigated,the process should be adjusted. C) The control limits should be adjusted.

D) The measuring equipment should be recalibrated.

某工业设备生产项目定义了某生产过程。这个过程用来生产20cm长的不锈钢螺栓。控制边界为19.955 cm和20.045 cm。在测量该过程后得到下列数据:20.033 cm、19.982 cm、19.995 tin、20.006 cm、19.970 cm、19.968 cm、19.963 cm、19.958 cm、19.962 cm、19.979 cnl、19.959 cm。此种情况下,下列哪项是必须要做的?

A) 这个过程是在控制内的,不应该被调整。 B) 必须调查特殊原因,这个过程应该被调整。

C) 控制边界必须被调控。 D) 测量设备必须被校准。 192. is typically not referred to as a buffer type in critical chain project management. A) Resource buffer B) Free buffer C) Feed buffer D) Project buffer

——不是关键链项目管理中提到的典型缓冲的类型。

A) 资源缓冲 B) 自由缓冲 C) 接驳缓冲 D) 项目缓冲

l 93.All of the following must he performed during project initiating EXCEPT

A) identify and document business needs B) create a project scope statement C) divide large projects into phases D) accumulate and evaluate historical information

下列各项都在启动期间执行,除了 。

A) 识别和记录商业需求 B) 创建项目范围说明书

C) 将大的项目划分为若干阶段 D) 积累和评估历史信息

194.While working on an external project your customer asks you to perform some additional tasks that are not included in the formal contract.You should .

A) honor the customer’s request as sign of cooperation to ensure future business B) refuse the request and report the customer to your sponsor

C) acknowledge the request and advise the customer to submit a formal change request D) convene a meeting of the project team and rewrite the scope statement 在一个外部项目中.你的一个客户要求你完成一些额外的工作.这些工作不包括在正式合同中,你应该 。

A) 按照客户的要求做,表明自己的合作姿态,这对将来与客户做生意有帮助 B) 拒绝客户的要求,向你的项目发起人报告这件事

C) 接受客户的要求,并建议客户提交一份正式的变更申请

D) 召集项目团队会议,重新写项目范围说明书

195.During half way to the project execution.you were assigned as a project manager.After careful reviewing of the project,you found that the project might take double the time that the previous manager estimated.However, the upper management has been told that the project is on schedule.The previous manager is an old friend of yours.what will you do?

A) Report your evaluation to the upper management

B) Have a team meeting to find the alternatives to meet the project schedule C) Meet the previous project manager and turn the project back. D) Execute the project as planned by the previous manager.

在项目执行期的中间阶段,你被任命为该项目的经理。在对项目进行认真评估之后,你发现项目的工期要比前任项目经理估算的工期长一倍。可是,高层管理者却被告知该项目的进度是在按计划进行。前任项目经理是你的一个老朋友,你会怎么办? A) 向高层管理者如实报告你对项目的评估。

B) 召开团队会议.研究出满足原计划进度的其他替代方案。 C) 会见前任项目经理,扭转项目进度。 D) 按照前任项目经理制订的计划执行项目。

196.When there are conflict in the contract, is the first one should be resolved. A) schedule planning B) deputize C) contract term D) criterion

当合同中存在冲突时,首先需要解决的是——。

A) 进度计划 B) 代理 C) 合同条款 D) 规范

197.In managing a project.you notice that a deliverable mentioned in the general conditions of the contraet has not yet been received.The seller,however,says the special provisions of the contract void that dellverable.What should you do? A) Require the deliverable as in the contract.

B) Do nothing.

C) Contact the contract manager.

D) Send a letter requiring the deliverable is met.

在对项目进行管理的过程中,你注意到合同一般条款内规定的一项可交付成果还没有收

到。但是,卖方说明合同特别条款已经取消了该可交付成果。你应该如何做? A) 要求提供合同规定的可交付成果。 B) 不采取任何措施。

C) 与合同经理联系。 D) 签发函件,要求提交可交付成果。 198.Contract closure procedure and administrative closure procedure have several common characteristics,the following are their common characteristics except .

A) exit criteria B) contract term C) srep by step D) activities and responsibilities

合同收尾程序和行政收尾程序有很多相似之处,以下均是它们的共同特点,除了——。 A) 退出标准 B) 合同条款 C) 逐步处理 D) 活动与责任 199.Which type of input is the primary cause of conttact changes?

A) Independent estimates. B) Organizational policies. C) Statement of work. D) Approved changes requests

下述哪项输入是合同变更的主要原因?

A) 独立估算。 B) 组织政策。 C) 工作说明书。 D) 批准的变更请求。

200.A procurement audit is a structured review of the procurement process from procurement planning through contract administration.What is the primary objective of a procurement audit? A) Determine the issues with your present contract so that the contraet terms can be modified or improved.

B) Identify successes and failures that warrant transfer to other procurement irems on this

project or to other projects within the performing organization.